GB50443-2016水泥工厂节能设计规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

2 Energy Saving of General Layout and Building

2.1 General Layout

2.1.1 In addition to meeting the requirements of process flow,the general layout shall be with reasonable use of topography,clear division and compact arrangement.

2.1.2 The clinker production line should be set nearby the limestone mine.The cement grinding line shall be close to the product market and the source of additive material,and shall be located outside the blasting security line.